- Home
- Government
- Boards & Committees
- Planning Board / Architectural Review Board
- Major Planning Board Projects
Major Projects Under Review
Documents and Plans associated with major projects being reviewed by the Planning Board can be found here if they have been provided in digital formal by the applicant.
Ace Endico Amendments 2023, 80 International Blvd.
Barn Dog Farm, 96-108 Hickory Ridge Road
- 01-Barn Dog Farm - Cover Letter 2023-08-21
- 02-Barn Dog Farm - Application 2023-08-21
- 03-Barn Dog Farm - Statement of Use 2023-08-18
- 04-Barn Dog Farm - EAF 2023-08-21
- 05-Barn Dog Farm - Owner Consent - 2023-08-21
- 08-Barn Dog Farm - SWPPP 2023-08
- 09-Barn Dog Farm - Plans_2023-08-21
- 10-Barn Dog Farm - Stable 2023-08-21
- 11-Barn Dog Farm - Exercise Barn 2023-08-21
- 12-Barn Dog Farm - Maintenance Barn 2023-08-21
- 13-Barn Dog Farm - Tree Survey 2023-08-21
Brewster Yards/ProSwing, Pugsley Road (See link to left)
Civetta Fill Placement, 2-10 Mount Hope Lane
Centennial Golf Parking, 8 -15 Centennial Lane
EE Brewster, LLC, 1534 Route 22
- 01_062022pb
- 03_SURVEY_1.31.22
- 04_PB Application
- 05_PB_Site Plan_Checklist
- 06_FEAF
- 08_Brewster-Residential Architecturals
- 09_Self-Storage Architecturals
- 01_022123pb
- 02_2023-02-21_EE Brewster_Full Set_SS
- 03_2023-02-21_Brewster Set
- 04_2023-02-16_Self-Storage Elevations
- 05_Brewster Grey 2-20-23
- 06_022123.Waiver
- 07_ReportEffectFindingNoImpact_133029715308651962
- 08_2023-02-21 EE Brewster SWPPP
- Updated Traffic Study Final 2-22-23
- Response to AKRF Comments 2-22-23
- 01_040323pb
- 02_2023-04-03 EE Brewster Full Set_SS
- 03_2023-04-03_Brewster Set
- 04_2023-04-03_Self-Storage Set
- 05_Brewster 3-28-23 sml
- 06_040323.Statement of Use
- One-Lane Analysis
Green Chimneys Boni Bel, 301-315 Doansburg Road
- 01_020722spb
- 06_ToS PB Application
- 07_PB_Site Plan_Checklist
- 08_020722_Statement of Use
- 09_020722_Waiver Letter
- 02_21220_Full Set-SS
- 04_GCBB A-100-11x17-JF
- 05_GCBB A-300
- 13_20220207_Materials and Color Board
- 10_SEAF and Mapper
- 15_0222_001-Boni Bel
- 11_s_BoniBel view1
- 12_s_BoniBel view2
- 2022_05_03 GrnChimn_A120_Landscape Architect Review
- Town Planner Memo_2022-05-03 Green Chimneys
Honors Field (f/k/a Southeast Memorial Park), 573 North Main Street
Orchard Hill Logistics, 151 Fields Lane
- Treetop Cover Letter
- Application for Site Plan Approval
- Full Environmental Assessment Form
- SWPPP_2022-12-19
- 0. Treetop Cover Letter (04.17.2023 v2)
- 01. Orchard Hill Logistics Center - JMC Site Plans_2023-04-17
- 02. Nelson Worldwide Architectural Drawings
- 03. Nelson Worldwide Renderings
- 04. Aerial Photograph Figure
- 05. List of Abutting Property Owners_2023-04-17
- 06. CREE Photometric Lighting Plan
- 07. Traffic Study_2023-04-17
- 08. Parking Summary Memorandum_2023-04-17
- 09. NYSDEC Approved Wetland Validation Boundary Map
- 10. LtLaPerch (Comment Response)_2023-04-17
- 11. SHPO Effect Finding Letter
PLDC, LLC, 45 Holmes Road
Salinger's Orchards, 200-202 & 222 Guinea Road
Southeast Kitchen & Bath, 10 Old Doansburg Road
234 Old Nichols Road, 234 Nichols Road, 170 Peach Lake Road & 75 Nichols Road
Twin Oaks Ventures, LLC, 189 Brewster Hill Road
Projects Recently Approved
Ace Endico Expansion, International Blvd.
- 00-SEPB-LaPerch-Ace Endico 2-3-21
- 01-Traffic Study
- 02-ACE ENDICO SITE PLAN 1-22-2021
- 03-ACE ENDICO-LLA_1.25.21-C_36x48_SS
- 04-20 1204 ACE ENDICO GARAGE PLAN Revised Sheet 3
- Ace Endico Traffic Study
- Galante Letter to NYSDOT_02-10-21
- 01-HH response 2-2-21
- 21_02_22 SEQR 17-025 Conceptual Approval letter
Allview Avenue aka Mazzotta Subdivision
Baker Farm Subdivision, Enoch Crosby Road
Barrett Hill Site Plan Amendment & Special Permit, 41 Mt. Ebo Road
Drew Realty / Site One, 160 & 170 Fields Lane
Eurotech, 19 Sutton Place
- EAF
- PB ltr re Outside Storage
- Checklist
- storage code section
- Application - Signed
- Statement of Use
- PB ltr re Eckardt Email Comment
- SY1 Parking Site Plan
- SY2 Utility and Grading Plan
- SY3 Erosion Control Plan
- SY4 Landscape Plan
- PCDOH Approval of Wastewater Treatment
- PCDOH Approval Letter
- Bond Estimate.2.2.22
43 Farm to Market Road
- Statement of Use 12.7.22
- Response ltr to Jacobson Review of 11.22.22
- Response ltr to AKRF Review of 11.19.22
- Gnome Systems Powerpoint Presentation
- SY1 PARKING SITE PLAN
- SY2 PHASE I-II UTILITY PLAN
- SY2A PHASE III-IV UTILITY PLAN
- SY3 EROSION CONTROL PLAN
- SY4 EROSION CONTROL DETAILS
- SY5 CONSTRUCTION DETAILS
- SY6 DETENTION BASIN PLAN
- SY6A BIO RETENTION BASIN
- SY7 LANDSCAPE_ LIGHTING PLAN
- D1 PRE DEVELOPMENT OVERLAY
- D2 POST DEVELOPMENT OVERLAY
- D3 SWALE _ PIPE OVERLAY
- A3 GREEN HOUSE PLANS
- T1 FIRE TRUCK TURNING
- SWPPP 12.5.22
- Drainage- Attachment M 12.5.22
Guardian Veterinary Specialists, 4 & 20 Hardscrabble Heights
Home Depot, 80 Independent Way
Lakeview Plaza, 1505-1515 Route 22
Maco Land Properties , 1651 Route 22
Roth Nursery Subdivision, 291 Foggintown Road
Saw Mill Wood Processing, 20 Branch Road
Southeast Executive Park - Parking, 185 Route 312
- 1 SEPB-Southeast Executive Park 9-5-18
- 1a
- 1b
- 1c
- 2 SEP app 9-5-18
- 3 SEP SEAF
- 4 NYCDEP-SEP 8-31-18
- Involved Property Owners list
- SWPPP-Vanguard 8-31-18
- 1-COVER PAGE CS-1
- 2- existing conditions E-1
- 3- Parking Area Additions _Dwy extension SP-1
- 4- Erosion Control For Parking Area Additions _Driveway Extension Plan EC-1
- 5- PROFILES P-1
- 6- DRAINAGE DETAILS D-1
- 7- DRAINAGE DETAILS D-2
- 8- EROSION CONTROL NOTES_DETAILS D-3
- 9-LIGHTING PLAN L-1
- 10-PLANTING PLAN L-2
Terravest III ICP Phase 3 Senior Housing
- 00-SEPB-LaPerch-Terravest 3-Amended Site Plan 7-5-2022
- 01-Terravest III-Amended Site Plan App
- 02-FEAF-Part 1-T3 7-5-2022
- 03-STATEMENT OF USE-Terravest 3 7-5-2022
- 04-T3 Utility Plan- Layout Comparison-7-5-22
- 05-T3 Utility Plan- Overlay Comparison-7-5-22
- 06-T3 Utility Plan- Amended Site Plan-7-5-22
- 07a-Architectual-Makefield
- 07b-Architectual-Maple Glen
- 07c-Architectual-Odessa
- 07d-Architectual-Welles
251 Fields Lane
- SY1 PARKING SITE PLAN
- SY1A PARKING_LANDSCAPE PLAN
- SY1B SU30 TURNING RADII
- SY2 UTILITY _ GRADING PLAN
- SY3 EROSION CONTROL PLAN
- SY4 CONSTRUCTION DETAILS
- SY5 EROSION CONTROL DETAILS
- SY6 SITE DETAILS-DETENTION BASIN
- SY7 WETLAND MITIGATION PLAN
- SY7A STREAM BUFFER PLANTS
- SY7B POND CONSTRUCTION_PLANTS
- SY7C GREEN ROOF SPECS
- D1 PRE-DEVELOPMENT OVERLAY
- D2 POST DEVELOPMENT OVERLAY
- Response ltr to Jacobson Review of 11.22.22
- Response ltr to Aspect 120 Review of 11.21.22
- Response ltr to AKRF Review of 11.19.22
- NYCDEP Waiver Letter
- Garcia response ltr 11.16.22